Snyder, Texas
Estimated land requirement of 10 acres per MW, totaling approximately 1,000 acres for the 100 MW phase.
Approximately 186,000 high-efficiency solar panels (assuming 700 W panels).
Around 50 central or string inverters, optimized for energy conversion efficiency and grid stability.
Around 3,100 high technology single-axis solar trackers equipped with backtracking and safety features to guarantee maximum energy output and support extreme wheater conditions.
Projected to generate 280,420 MWh annually, sufficient to power approximately 21,000 homes while offsetting over 150,000 metric tons of CO2 annually.
© 2025 Levona Renewables Corp. | Alltype Publicidade e Marketing Ltda. All Rights Reserved.